Ciorba Group provided preliminary, final design and construction engineering services for the reconstruction of 1.2 miles of a four lane unmarked county highway. Work involved total pavement replacement, new storm sewers along with in-line detention, installing a street lighting system, modernizing two signalized intersections and interconnection with existing signal systems and replacing the sanitary sewer and water main. Design plans included the removal and disposal of substantial amounts of hazardous and special waste found within the project limits. STP funds were used for construction.