John Deere Road (IL 5) Widening & Reconstruction Commuter Drive Reconstruction and Bicycle Path Extension Pine Street and Eldorado Street over the UP Railroad First Avenue Flood Control South Wheeling Road Drainage Improvements I-80 at US 30 Interchange Reconstruction North Tri-State Tollway (I-94) Reconstruction Millennium Trail Pedestrian Bridge Concept Studies Peotone-Beecher Road over the Exline Slough Pfingsten/Kates Road over Metra Tracks